![Hilton Hotel](https://veritystructure.com/wp-content/uploads/2022/09/1-1-770x350.jpg)
Hilton Hotel
Project Location : Abu Dhabi, UAE Main Contractor : Alu Nasa Aluminium Industry LLC Consultant : ATKINS Scope : Design and Build Glass and Steel Facades in tension cable and Spider Fitting Area : 6,000 Sqmtr
![Cleveland Clinic](https://veritystructure.com/wp-content/uploads/2022/09/1.jpg)
Cleveland Clinic
Project Location : Abu Dhabi, UAE Main Contractor : Six Construct – Samsung JV Architect : ADDIES Consultant : KEO Scope : Installation of Glass and Steel Facades with Tension cable Structures Area : 38,000 Sqmtr
![The Glass Box](https://veritystructure.com/wp-content/uploads/2022/09/glassbox-770x350.jpg)
The Glass Box
Project Location : Dubai Main Contractor : Habtoor Leighton Group (HLG) Architect : Consultant : Aref and Bintoak Scope : Installation of Free Standing Glass Façade with Custom made jumbo Glass Area : 600 Sqmtr
![Al Forsan Hotel And Resort](https://veritystructure.com/wp-content/uploads/2022/07/1-770x350.jpg)
Al Forsan Hotel And Resort
Project Location : Abu Dhabi Main Contractor : Fibrex Construction Group Architect : Consultant : ATKINS Scope : Design abd Build Tension cable Facade Area : 2,200 sqmtr
![Quranic Park](https://veritystructure.com/wp-content/uploads/2019/07/8G6A0840-1024x683-1-770x350.jpg)
Quranic Park
Project Location : Khawaneej, Dubai Main Contractor : Aroma International Building Contracting LLC Client : Dubai Municipality Consultant/Architect : OBE Architects Scope : Design and Build 3D free Form Canopy Area : 1800 Sqft